网上棋牌游戏

首页 > 五金工具 > 株洲醴陵变电站构架厚度误差产品范围 Position: Home > Hardware Tools > Zhuzhou Fuling Substation Frame Thickness Error Product Range

Zhuzhou Fuling Substation Frame Thickness Error Product Range

发布时间: 2019-12-29 17:36:24 发布人: 张鹏 字体大小: 【大】 【中】 【小】 Article source: hpsdgyhfj Release time: 2019-12-29 17:36:24 Publisher: Zhang Peng Font size: [Big] [Medium] [Small]

Zhuzhou Fuling Substation Frame Thickness Error Product Range Material: Steel. Quality management Zhuzhou Fuling differential protection has the advantages of being able to quickly and selectively remove faults in the protection range, and the wiring is properly debugged without misoperation; the disadvantage is that it is not sensitive enough to reflect the non-serious interturn short circuit inside the transformer. Quality improvement The above shows and describes the basic principles and main features of the utility model and the advantages of the utility model. Those skilled in the industry should understand that the weight gauge of Zhuzhou Fuling Substation Frame. The utility model is not subject to the above embodiments. The examples and descriptions only describe the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements. These changes and improvements all fall into the claimed subject matter. Within the scope of the utility model, the scope of protection claimed by the present utility model is defined by the attached claim and its equivalent. Reasons for Zhuhai with excellent quality and treatment measures: The insufficient length of the anchor bolts is caused by the improper exposed length of the anchor bolts during the construction of the foundation embedded parts; the anchor bolts are rusted, which is improper protection of the finished products, and the storage of the anchor nuts and pad Caused by improperness; the pad does not fit tightly with the tower foot plate, which is mainly caused by the interference between the pad and the tower foot plate. In order to avoid the above-mentioned defects, the height difference of the foundation top surface, the exposed height of the anchor bolts, and the pre-deflection value of the corner tower should be checked on site before the tower building operation to ensure that there is no problem before the tower building operation is carried out. Construction shall not be forced; severely rusted nuts shall not be used in engineering, and those that are floating on the surface shall be derusted and spray-painted to prevent further corrosion; if the blocks are in conflict with the welding seam, the blocks shall be appropriately cut. In order to reduce the number of components (nodes) in the substation, the quality department has established a national standard thickness of Zhuling Fuling Substation, reduced the dependence of the automation function of the bay on the fiber network, and separated the bay and process layers from the dependence on the fiber network. In order to progress and simplify the structure of the substation, this article puts forward a concept of integrating and integrating equipment in the process layer and the space level in the substation, and then puts forward the architecture of the substation. According to the analysis, it is considered that the integrated concept and the realization of the chemical substation architecture are advanced and can meet the requirements of future power grid development. Zhuzhou Fuling Substation Frame Thickness Error Product Range Among them, 1 tower body, 2 fixed plates, 3 springs, 4 buffer plates, 5 chute, 6 protective plates, 7 sliders, 8 support plates, 9 rubber pads, 10 rubber bars, 11 Movable plate, 12 swivel ring, 13 fixed shaft, 14 movable slot, 15 fixed block, 16 auxiliary plate, 17th spring, 18th spring. Preferably, the manufacturing cost is on the axis line of the center pin of the angle ruler. it is good

Zhuzhou Fuling Substation Frame Thickness Error Product Range


Zhuzhou Fuling Substation Frame Thickness Error Product Range The specific implementation is shown in Figure 1. An auxiliary welding device for angle steel towers, including a base motor, a rotating seat, a frame, a connecting shaft, a movable pin, an angle ruler, an arrow, a movable connection, and a cylinder fixed connection. 1 T-slot connection shaft motor 1 Frame 1 The motor 2 is fixedly connected inside the lower side of the base 1, the upper output shaft of the motor 2 is fixedly connected with the center of the lower side of the rotary base 3; the rotary base 3 is movably connected at Above the base 1; the bottom of the frame 4 is fixedly connected to the left side above the rotary base 3, and a connecting shaft is movably connected to the upper hole of the frame 4; the bottom of the frame 17 is fixedly connected to the upper right side of the rotary base 3, A connection shaft is movably connected to the upper hole of the frame 17, and the left side of the motor 16 is fixedly connected to the upper right side of the frame 17, and the left output shaft of the motor 16 is fixedly connected to the right end of the connection shaft 15; the movable seat 6 The upper side between the horizontal frame 4 and the frame 17, the bottom of the movable seat 6 is fixedly connected to the connecting shaft 5 and the connecting shaft 15, respectively; the lower left side pin 7 of the table 13 is movably connected to the upper left side of the movable base 6. ; The angle ruler 8 is fixed Connected to the upper left side of the movable base 6; the right side of the arrow 9 and the angle ruler 8, the arrow 9 is provided on the side of the workbench 13; the movable connection base 10 is fixedly connected to the left side of the bottom of the workbench 13, and the movable connection base The lower side of 10 is hinged to the upper side of the oil cylinder 11; the lower side of the oil cylinder 11 is hinged to the upper side of the fixed connection seat 12; the bottom of the fixed connection seat 12 is fixedly connected to the upper side of the movable seat 6. The length of both sides of the outer L-shaped plate 2 is smaller than the length of both sides of the inner L-shaped plate 1. Substations must establish the following technologies. Weight: over 10 tons. Zhuzhou Fuling technology implementation elements: The utility model aims to solve the above problems, thereby installing an angle steel tower installation structure with high installation efficiency, high accuracy and convenient operation. Equipment maintenance relay protection module, it can directly obtain the required information from the on-site measurement and control device, respond in a short time, and its protection function is not blocked under any circumstances, so it is a module with high priority. The material of the inner L-shaped plate 1 and the outer L-shaped plate 2 is a steel plate. Inspection requirements Hami specific implementation angle steel wall of the power tower, angle steel walls, bolt holes at both ends of the angle steel wall, epoxy steel resin carbon fiber layer on the surface of the angle steel wall, epoxy polyamide resin carbon fiber layer on the outside surface of the angle steel wall. In this embodiment, the power tower angle steel is 90x90mm, the angle steel wall thickness is 10mm, the length is 1200mm, the bolt hole diameter is 18mm, the epoxy asphalt resin carbon fiber layer thickness is 5mm, and the epoxy polyamide resin carbon fiber layer thickness is 5mm. The surface of the galvanized angle steel wall with bolt holes at both ends is provided with an epoxy asphalt resin carbon fiber layer for enhancing and corroding functions, and an outer surface is provided with an epoxy polyamide resin carbon fiber layer for reinforcing and corrosive functions. Zhuzhou Fuling Substation Frame Thickness Error Product Scope The grid has a larger number of applications of new-type flexible power transmission technology and equipment, as well as the access to intermittent distributed clean power sources such as wind power and solar power generation. Technical requirements. Energy cost 1 is a structural illustration of the utility model. Middle 1-hoop, 2-U-shaped channel steel, 3-support bar, 4-tightening device, 5-hanging ring. Home recommendation

Zhuzhou Fuling Substation Frame Thickness Error Product Range


[Technical Field] [0001] The present invention belongs to the field of power transmission and distribution, and particularly relates to a line structure and a line structure. It is recommended to consult the differential protection and gas protection to cooperate with each other to complete the task of protecting the main transformer. Operating experience has proven that when internal faults occur in the transformer, both differential protection and gas protection can be reflected. When the internal fault of the transformer (such as a short between layers), the oil flow rate and the increase in the secondary current are reflected, it is possible to activate the two types of protection. As for which kind of protection works first, it must also be decided by the nature of the fault [2]. Before the gas relay is installed and put into operation, open the communication valve between the oil pillow and the fuel tank to fill the gas relay with oil, and at the same time open the exhaust hole to air the gas relay until the exhaust hole continuously emits oil. Trustworthy technology implementation elements: The utility model aims to solve the above problems, thereby providing an angle steel tower installation structure with high installation efficiency, high accuracy, and convenient operation. A mobile substation refers to a substation used to temporarily supply power to important users or construction units. Electrical equipment is installed on trains or cars with small capacity. [Background technology] [0002] Two power plants, two generating units, two outgoing lines plus a backup power lead, a substation frame lifting device, which includes a hoop U-shaped channel steel support rod (steel material), a tensioner hanging ring 5; U Both ends of the section channel 2 are welded to the hoop 1. The U channel channel 2 is fixedly connected to the lower end of the support rod by bolts (the U channel channel 2 is provided with a bolt hole, and the lower end portion of the support rod is provided with a bolt hole. In this embodiment, four bolt holes are used, and four bolts are connected;), the upper end portion of the support rod is fixedly connected with a hanging ring thread tensioner 4 hanging on the hanging ring 5. The angle between the cement rod and the vertical direction is 5 °. To achieve uniform stress during the lifting process, the connection angle between the hoop and the support rod should be 95 °. The diameter of the hoop should be slightly smaller than the cement rod, and the bolt can be firmly fixed to the cement rod after tightening, so the diameter is determined to be 30cm. The length of the support rod is d = 2 meters. Using two substation frame lifting devices in common use, Zhuzhou Fuling substation frame, the hoop of each substation frame lifting device is fixed to the cement rod, and the end of the frame is lifted by the tensioner; the hoop of the first substation frame lifting device It is fixed on the first cement rod, and the other end of the frame is lifted by the thread tensioner. Overhead lines are usually required to connect the host group and the booster station. In order to save water, inland power plants mostly adopt the cooling method of circulating cooling water towers, and the cooling water towers are arranged near row A of the main plant to shorten the length of the circulating water pipes. At this time, the circuit overhead cooling tower connecting the main plant and the booster station. If the circuit line groups are arranged in order from the top to the bottom in the form of a tower, the difference in lead height is too large, resulting in inconvenient connection and high cost. Therefore, conventional loop overhead lines are constructed side by side. However, the width of each frame is about 30-45 meters, and the floor span is about 90-135 meters, which results in a large power plant and a large investment, and the distance between the two cold dewatering towers is increased, increasing operating costs. Excellent service In addition, the boost station is also connected to DCS and NCS for data communication and secondary equipment. Preferably, a rubber strip is fixedly connected to the left side of the movable plate, and the end of the rubber strip remote from the movable plate is fixedly connected to the upper surface of the buffer plate.